In 2011 WaveCom opened the the newest and most modern datacenter in Estonia. This cutting-edge center can house up to 55 racks. The investment of ca 300 000 EUR was almost entirely financed from our own resources. The two main contractors were Gustaf-Tallinn for general construction and electrical works, and Citykliima for failover air conditioning and ventilation.

 

Building

  • Secure environment: Perimeter firewall, fire resistance EI60, i.e. non-combustible materials
  • Fire resistant partitions
  • Metal screen, shielded room to provide radio-silent environment
  • Double waterproof ceiling with joist gutters.
  • Raised floor and drain away
  • HP original racks.
serveriruum
serveriruum

Power

  • ABB and Moeller/Eaton newest automatic s and power solutions
  • The entire facility is earthed. Equipotential bonding
  • Main power 3x600AMP
  • Caterpillar standby diesel generator.
  • Power from 40kVa EATON Powerware 9335 online ups´es
  • Redundant power in every rack.
  • Fail-Safe Transfer Switches for devices with single power supply

Environment

  • Redundant close control air conditioners with 2 compressors from Tecnair LV
  • Guaranteed temperature of 20±1ºC and humidity of 50%
  • Network monitoring: required detectors and sensors: leakage, humidity, etc.
  • Ventilation with overpressure
  • Fully monitored and automated environment
serveriruum
serveriruum

Connectivity

  • Datacenter is connected to fiber ring (2x24 fibers).
  • Backup Gigabit MicroWave link
  • Racks are connected to 2 different Cisco 6509 switches with redundant supervisors and backbone connectivity. 
  • Fiber optic cables only.

Security

  • Redundant high end security system
  • Video surveillance
  • Security contracts with G4S and Securitas